Jerry fischer

Author's details

Name: Jerry Fischer
Date registered: May 3, 2016

Latest posts

  1. Updates through May 2017 — May 30, 2017
  2. Update hours on RV12 — — January 11, 2017
  3. update on build hours to Nov 3rd 2016 — November 5, 2016
  4. Update on Build 10-24-2016 — October 24, 2016
  5. Update on RV12 — September 21, 2016

Author's posts listings

May 30

Updates through May 2017

Its been awhile since we have updated the site & we have finished the fuselage through the installation of the tail cone, seats, instrument panel with a matte black finish on the panel & glare shield. The wing kit arrived several weeks ago and progress on the spars is well underway. The finishing kit has …

Continue reading »

Jan 11

Update hours on RV12 —

102.pg27-04 steps 1-5 19 11/8/2016 19.0 103.pg28-03 to 28-05 step 3 8 11/10/2016 8.0 104.pg28-05-06 steps 5 & 7 10 11/15/2016 10.0 105.pg28-06 step7 pg29-02 step 2 9 11/17/2016 9.0 106.pg29A-steps3-5 & deburr panels 4.5 11/22/2016 4.5 107.clean hangar 2 12/6/2016 2.0 108.deburr map box components 7.5 12/8/2016 7.5 109.1201.8 box pg29A-02 steps 3-9 pg9A …

Continue reading »

Nov 05

update on build hours to Nov 3rd 2016

We have just about finished the fuselage and need to continue on the wing kit as soon as we have the funds available. Activity Time Required Start Date Exp. Comp. Actual Total Hrs.forTask 39.11-6 step 8 11-08 step 11 11-08 steps 1-7 inventory fuselage kit 12.5 5/17/2016 12.5 40.11-05 step4 10 5/19/2016 10.0 41.11-08 step9-11 …

Continue reading »

Oct 24

Update on Build 10-24-2016

We are finishing up the metal work for the fuselage. We are getting the interior ready to paint and then install rudder pedals, brake system & rudder cables along with the torque tube for the stabilator. We still need to raise more funds for the purchase of the wing kit.

Sep 21

Update on RV12

Well, we are moving right along on the fuselage. over the past several weeks we have completed the lower firewall mounting, the seat hinge attached to the center section, the side skins on the center section, and various bits and pieces. Last night we assembled the roll bar and started fitting to the fuselage attach …

Continue reading »

Aug 04

RV12 hours update August 4th 2016

39.11-6 step 8 11-08 step 11 11-08 steps 1-7 inventory fuselage kit 12.5 5/17/2016 12.5 40.11-05 step4 10 5/19/2016 10.0 41.11-08 step9-11 12-01 step1 10.1 5/21/2016 10.0 42.12-02 -04 step 3 11.5 5/24/2016 11.5 43.inventory continued of fuselage 20-02 rivet nut plates 6 5/26/2016 6.0 44.remake several errors on tail section.Tailcone Inspection 7 5/31/2016 7.0 …

Continue reading »

Apr 16

More Complete Hours Update

RV 12 Build Schedule for EAA Chapter 690 Activity Time Required Start Date Exp. Comp. Actual Total Hrs.forTask Meet @ Hangar 6 to plan location of various location 1-2 hrs 4-Feb 4-Feb 3.0 of parts storage, assembly 1. Prepare Area for part storage & Assembly. Labeling parts drawers & bins 12-18 hours by Feb 10 …

Continue reading »

Apr 12

More Hours

We added 54.5 hours to the build over the period 3/31-4/11 finishing the horizontal stab.and are well along on the tail cone.

Mar 05

Update on progress 3/5/2016

Latest build hours & processes: Date Hrs. 6. Pg 06-03 06-04, 06-05, spar cap, spar, and 2/20/2016 35 associated parts of Vertical Stabilizer match drill, deburr, prime skeleton parts 2/25/2016 22 7. 06-06, 06-07 complete assembly of vert. stab. 2/26/2016 Cleco, rivet skeleton. skeleton complete. rivet skin to skeleton 3/3/2016 22.8 Total hours 75.8

Feb 22

2/20 Saturday work session

Gordon Fowlkes, Jerry Fischer, Jaimie Painter worked on the RV12 vertical stabilizer match drilling the stiffeners and riveting them. Progress continues

Older posts «