May 05

Wow….It is Beginning to Look Like an Airplane

A lot of work has taken place over the last week or so.  The empennage is nearing completion as we await notification that the fuselage has shipped.  Great job everyone.

 

Duane inserts rivets

Duane inserts rivets

Joel pretending to pull a rivet!!

Joel pretending to pull a rivet!!

Fred drilling rivet holes

Fred drilling rivet holes

Louis pulling riviets

Louis pulling rivets

Louis checking what's next

Louis checking what’s next

Tailcone sitting in the cradle preparing to get the tail feathers attached

Tailcone sitting in the cradle preparing to get the tail feathers attached

Louis, John and Joel looking fierce

Louis, John and Joel looking fierce

Rich laying down on the job!!

Rich laying down on the job!!

 

Apr 16

More Complete Hours Update

RV 12 Build Schedule for EAA Chapter 690
Activity Time Required Start Date Exp. Comp. Actual Total Hrs.forTask
Meet @ Hangar 6 to plan location of various location 1-2 hrs 4-Feb 4-Feb 3.0
of parts storage, assembly
1. Prepare Area for part storage & Assembly. Labeling parts drawers & bins 12-18 hours by Feb 10 By Feb 12 5.0
This includes using current shelving & obtaining small parts drawer
cabinets/bins for rivets/nuts/bolts etc.
Jerry, Brian, repaired drill press switch housing. Gordon worked on wedge 7-Feb 7-Feb 2.0
tool. Jerry completed labeling of parts bin & inventory 2.0
2. Inventory tail kit & begin storing parts on shelves & in bins 4-6 hours by Feb 10 10-Feb 3.0

3. Obtain tables for assembly either build or purchase 2-4 hrs by Feb 5 by Feb 10

4. Start construction of tailcone Assembly ? By Feb 15 By Feb 28

5. Complete section on rudder bearings manufacture with Gordon Alex Jerry 3 15-Feb 3.0
& Joel

6. Pg 06-03 06-04, 06-05, spar cap, spar, and associated parts of vert. stab. 35 2/20/2016 2/26/2016 34.8
match drill, deburr, prime, rivet

7. 06-06, 06-07 complete assembly of vert. stab. Cleco, rivet skeleton complete 22 2/26/2016 3/3/2016 22.8
riveting of skin to skeleton
8. 07-02 steps 1 thru 8 5.5 3/5/2016 5.5
9. Pg 6 07-03 Step1 completed all steps 1 thru 4 13 3/8/2016 13.0
10. 07-04 steps 1 thru 2, 07-05 step 1 rudder horn assy. 3 3/11/2016 3.0
11. 07-05 complete steps 1 thru 4 6 3/12/2016 6.0
12. 08-02 steps 1 thru 4 stop for prime 4 3/13/2016 4.0
13. 08-02 steps 1 thru 5 6 3/15/2016 6.0
14. 08-02 step 5 08-03 steps 1 thru 5 6 3/16/2016 6.0
15. completed sec 8 09-02 steps 1thru 10, pg 09-03 step 1 25.5 3/19/2016 25.5
16. 09-03 comp steps 1 thru 10. 09-04 steps 1 thru 6 complete 10.5 3/24/2016 10.5
17. 09-04 steps 7 & 8 complete, pg 09-05 1 thru 5 complete. Page 09-06 steps 1-5 3/25/2016
complete. Pg 09-07 steps 1-2 complete bolts torqued & sealed 21 3/25/2016 21.0
18. 09-08 steps 1 & 2 9 3/26/2016 9.0
19. 09-08 steps 3-5 20 3/31/2016 20.0
20. 09-08 step 4 3.5 4/1/2016 3.5
21. 09-08 step 5 to 09-09 15.5 4/2/2016 15.5
22. 09-10 steps 1-5 end of sec 9 8.5 4/5/2016 8.5
23. Sec10 steps 1 & 2 5 4/9/2016 5.0
24. Sec 10 steps 3 & 4 2 4/11/2016 2.0

Total hours 239.6

 

20160421_145059_1024x576_042216 IMG_20160416_171623_1024x576_042216 Slack-for-iOS-Upload2_576x768_042216 Slack-for-iOS-Upload1_1024x768_042216 Slack-for-iOS-Upload_1024x768_042216

Apr 12

More Hours

We added 54.5 hours to the build over the period 3/31-4/11 finishing the horizontal stab.and are well along on the tail cone.

Apr 03

Saturday 4-2-2016

What do you do after  a great Pancake Breakfast and program?  You go down to the “Bishop Education Center” and work on the RV-12!!  The horizontal stabilizer is really coming along.

20160402_141859_1024x576

20160402_141913_1024x576 20160402_145603_1024x576 WP_20160402_13_03_52_Pro1_1024x576 WP_20160402_13_43_52_Pro1_1024x576 WP_20160402_15_00_38_Pro1_1024x576

Mar 31

And the beat goes on……

The threat of rain did not stop Duane Huff, Joel Levine, Louis Pucci, John Morgan, John Bongart, Gordon Fowlkes and Fred Huppertz from turning out to work on the RV-12 today.  More progress on the horizontal stabilizer. IMG_20160331_142406_1024x576_033116 IMG_20160331_144823_1024x576_03311620160331_154026_432x768_033116 IMG_20160331_155834_1024x576_033116 IMG_20160331_142239_1024x576_033116 IMG_20160325_170249_1024x576_032616

Mar 26

More Progress Being Made

Great progress continues to be made on the empennage of the RV-12.  Several guys got together Thursday and Friday to continue work on the horizontal stabilizer.  Vans has given us a crating date of May 9th for the fuselage.

20160308_154000_1024x576_030916

 

20160324_154917_1024x576_032516

WP_20160324_16_17_21_Pro_1024x576_032516

20160325_153335_1024x576_032616

IMG_20160325_170249_1024x576_032616

Mar 20

A Beautiful Day to Build

Saturday turned out to be a great day to build.  The day started with a Young Eagle event that saw EAA 690 and its volunteers fly 23 young folks. We had seven pilots flying five planes and finished up around 11:00am,  We flew a group from a local Boy Scout Troop that spent Friday night and Saturday at our hangar working on their aviation merit badge.  The predicted weather never materialized and everything worked out well.

Once Young Eagles was complete a large group proceeded to the Bishop Education Center to work on the RV-12. The project is moving forward fairly quickly and a lot of chapter members have been involved.  The fuselage has been ordered at this point and we expect to get notification of the ship date soon.

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

 

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

Mar 17

Fuselage on Order

Since we are making good progress, the fuselage kit has been ordered as of yesterday, 3/16.  We’ll keep you up to date on the details as they become known.

Thanks to all of those that have put time in on this project.  I hope everyone is learning and that wee can get more folks involved as we move forward.

Mar 11

Next Step

We’re making great progress on the empennage.  Van’s currently shows lead times of 8 weeks for the wing and fuselage kits.  The wing kit is $6,405 plus shipping and the fuselage kit is $5,595 plus shipping.  We currently have just over $5,800 in the RV-12 fund.  We’ll need to raise some more money to get the next kit on order soon.

Mar 09

Build Session 3/8/2016

We started the rudder assembly today and match drilled the skeleton parts, deburred, & scotchbrited them. After  wiping down with acetone, Gordo primed and hung up to dry.
John Kimmons, Joel Levine, Gordon Fowlkes, Rich Hopkins, John Morgan, Ron Brown ( who brought tools from Dave Henderson’s build), John Bongart, Jerry Fischer

20160308_170414_1024x576_030916 20160308_160442_1024x576_030916 20160308_160414_1024x576_030916 20160308_154000_1024x576_030916